A childcare centre fitout in Sydney costs between about $2,000 and $4,200 per square metre of indoor area in 2026, excluding GST, outdoor play areas, loose furniture and base-building work. The size is set by the National Quality Framework — 3.25 m² of unencumbered indoor space and 7 m² of outdoor space per child — so a 60-place centre needs roughly 250–300 m² of indoor playrooms before the cot room, kitchen, staff room, laundry, nappy-change and office are added.
| Level of finish | $ per m² | Program on site |
|---|---|---|
| Basic | 2,000–2,600 | 10–14 weeks |
| Mid | 2,600–3,300 | 14–18 weeks |
| Premium | 3,300–4,200 | 18–24 weeks |
Per m² of floor area, design and construct, excluding GST, equipment and base-building work. Under 80 m² add about 15%.
An existing approved centre refreshed: paint, floors, child-height joinery replaced, bathroom fittings, lighting, acoustic panels. No change to room layout or services.
Re-planned playrooms with new partitions and acoustic doors, new children's bathrooms and nappy-change, kitchen and laundry re-fit, new lighting and mechanical rebalancing.
New centre in a shell: full design to the Child Care Planning Guideline, new hydraulics to every playroom bathroom, commercial kitchen, laundry, mechanical throughout, indoor-outdoor thresholds, fencing and soft-fall to the outdoor area.
| Floor area | Basic | Mid | Premium |
|---|---|---|---|
| 300 m² | $600,000 – $780,000 | $780,000 – $990,000 | $990,000 – $1,260,000 |
| 600 m² | $1,200,000 – $1,560,000 | $1,560,000 – $1,980,000 | $1,980,000 – $2,520,000 |
| 900 m² | $1,800,000 – $2,340,000 | $2,340,000 – $2,970,000 | $2,970,000 – $3,780,000 |
All-in design-and-construct ranges from the September 2026 rates. Run your own floor area through the calculator.
Childcare always needs approval. A new centre, or a change of use into one, is a development application assessed against the Child Care Planning Guideline and SEPP (Transport and Infrastructure) 2021, then a service approval from the NSW Department of Education before it can open. Allow 4–8 months for the DA and start it before committing to the lease. Alterations inside an existing approved centre can go through a private certifier.




Send the floor area, the address and a few photos. Republic Design Build walks the site and comes back with one fixed price for design, construction and approvals.